{"id":6058,"date":"2022-10-11T15:21:32","date_gmt":"2022-10-11T19:21:32","guid":{"rendered":"https:\/\/news.maryland.gov\/mea\/?p=6058"},"modified":"2022-10-11T15:22:10","modified_gmt":"2022-10-11T19:22:10","slug":"future-srec-prices","status":"publish","type":"post","link":"https:\/\/news.maryland.gov\/mea\/2022\/10\/11\/future-srec-prices\/","title":{"rendered":"Future SREC Prices"},"content":{"rendered":"\n<p><span style=\"font-weight: 400\">A common perception is that the Solar Renewable Energy Credit (SREC) prices are set by the government. This is not true. Actually, SREC prices are set by the electricity market, by buyers and sellers. The buyers are the electricity suppliers and the utilities (offering Standard Offer Service to individuals who have not selected an electricity supplier other than their utility). They are required to present to the Maryland Public Service Commission certification of the number of SRECs bought during the year, which is calculated by multiplying their annual electricity sales by the solar content requirement from the state\u2019s Renewable Portfolio Standard (RPS or commonly called the solar carveout). The electricity supplier, or Standard Offer Service provider, can buy the SRECs on the open market, or, if they are unable to buy the required number of SRECs, they can pay a penalty at a rate set by state law, called the Alternative Compliance Payment (ACP).\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">During times when solar production is larger than the solar carveout rate, then SRECs will be plentiful, and electricity suppliers (and the Standard Offer Service provider) will get all the SRECs they need from the SREC market. During a time period where\u00a0 there is\u00a0 an overabundance of SRECs available, the price for an SREC would be expected to be low. This occurred during the period of 2016-2018. See Figure 1. During this period the value of an SREC went from about $120 to $5. See Figure 2. In 2019, the Maryland General Assembly changed the solar carveout component of the RPS, and once again, the SREC requirement exceeded its availability. Once the excess SRECs were expended (2020-2021), the price of an SREC quickly increased, ultimately reaching the level of the ACP. This happened in 2022.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">A review of Figure 1 shows that, unless there is a solar installation spurt in Maryland, the total solar installation will remain below the solar carve out requirement. If that happens, the value of the SREC will likely remain at the level of the ACP payment. Figure 3 shows future ACP levels currently set by state law (as of August 2022). It is likely that SREC levels will follow the levels of the ACP payments. SREC levels would never be expected to exceed the ACP level as it would be more cost effective for the electricity supplier to pay the lower ACP payment instead of buying a higher priced SREC on the open market.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">There are three main factors affecting the value of SRECs:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">Building more solar in Maryland could ensure the total solar installations in Maryland exceeded the solar carveout rate required by the RPS. If that were to happen, the value of SRECs would likely decrease<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The legislature could adjust the solar carveout requirement of the RPS. Raising the solar carveout requirement would ensure the SREC value remained essentially equal to the ACP rate. Lowering the solar carveout requirement could ensure more SRECs were produced than are required, placing the market in an oversupply status, thus lowering the value of a given SREC.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"font-weight: 400\">The legislature could adjust the level of ACP payments. Raising the ACP would raise the value of an SREC in an undersupplied market, but would have little effect on SREC value in a market with SREC oversupply.<\/span><\/li>\n<\/ol>\n<p><a href=\"http:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/Solar-Carveout.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-6060\" src=\"http:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/Solar-Carveout-300x179.png\" alt=\"\" width=\"405\" height=\"242\" srcset=\"https:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/Solar-Carveout-300x179.png 300w, https:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/Solar-Carveout.png 648w\" sizes=\"auto, (max-width: 405px) 100vw, 405px\" \/><\/a><\/p>\n<p><i><span style=\"font-weight: 400\">Figure 1: Solar Carveout and Solar Installation vs. Time<\/span><\/i><\/p>\n<p><i><span style=\"font-weight: 400\">Source: Solar Carveout: Section 7-705 of the Maryland Public Utilities<\/span><\/i><span style=\"font-weight: 400\"> \u00a0 <\/span><i><span style=\"font-weight: 400\">Article<\/span><\/i><\/p>\n<p><i><span style=\"font-weight: 400\">Source: Total Solar Installation: PJM GATS database \u201cRenewable Generators Registered in GATS\u201d\u00a0<\/span><\/i><\/p>\n<p><a href=\"https:\/\/gats.pjm-eis.com\/gats2\/PublicReports\/RenewableGeneratorsRegisteredinGATS\"><i><span style=\"font-weight: 400\">gats.pjm-eis.com\/gats2\/PublicReports\/RenewableGeneratorsRegisteredinGATS<\/span><\/i><\/a><\/p>\n<p><a href=\"http:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/ACP-and-Avererage-SREC-Values.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-6061\" src=\"http:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/ACP-and-Avererage-SREC-Values-300x184.png\" alt=\"\" width=\"406\" height=\"249\" srcset=\"https:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/ACP-and-Avererage-SREC-Values-300x184.png 300w, https:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/ACP-and-Avererage-SREC-Values.png 647w\" sizes=\"auto, (max-width: 406px) 100vw, 406px\" \/><\/a><\/p>\n<p><i><span style=\"font-weight: 400\">Figure 2: ACP and Average SREC Value vs. Time<\/span><\/i><\/p>\n<p><i><span style=\"font-weight: 400\">Source: ACP Levels: Section 7-705 of the Maryland Public Utilities<\/span><\/i><span style=\"font-weight: 400\"> \u00a0 <\/span><i><span style=\"font-weight: 400\">Article<\/span><\/i><\/p>\n<p><i><span style=\"font-weight: 400\">Source: SREC values over time: Compiled from data from Fleet Exchange Environmental Markets <\/span><\/i><a href=\"blank\"><i><span style=\"font-weight: 400\">flettexchange.com\/markets\/srec\/maryland\/historical-data<\/span><\/i><\/a><\/p>\n<p><a href=\"http:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/ACP-Prices.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-6059\" src=\"http:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/ACP-Prices-300x181.png\" alt=\"\" width=\"406\" height=\"245\" srcset=\"https:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/ACP-Prices-300x181.png 300w, https:\/\/news.maryland.gov\/mea\/wp-content\/uploads\/sites\/15\/2022\/10\/ACP-Prices.png 597w\" sizes=\"auto, (max-width: 406px) 100vw, 406px\" \/><\/a> \u00a0<\/p>\n<p><i><span style=\"font-weight: 400\">Figure 3: Future ACP Price vs Time<\/span><\/i><\/p>\n<p><i><span style=\"font-weight: 400\">Source: ACP Levels: Section 7-705 of the Maryland Public Utilities<\/span><\/i><span style=\"font-weight: 400\"> \u00a0 <\/span><i><span style=\"font-weight: 400\">Article<\/span><\/i><\/p>\n<p>\u00a0<\/p>\n<p><span style=\"font-weight: 400\">This article uses assumptions that simplify the workings of the SREC market, and as such, SREC values may differ from the statements in this article. <\/span><span style=\"font-weight: 400\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A common perception is that the Solar Renewable Energy Credit (SREC) prices are set by the government. This is not true. Actually, SREC prices are set by the electricity market, by buyers and sellers. The buyers are the electricity suppliers and the utilities (offering Standard Offer Service to individuals who<a href=\"https:\/\/news.maryland.gov\/mea\/2022\/10\/11\/future-srec-prices\/\">&nbsp;&nbsp;&#8230;Learn more<\/a><\/p>\n","protected":false},"author":214,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[42,25],"tags":[347,348],"class_list":["post-6058","post","type-post","status-publish","format-standard","hentry","category-blog","category-main","tag-electricity","tag-srec"],"acf":[],"_links":{"self":[{"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/posts\/6058","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/users\/214"}],"replies":[{"embeddable":true,"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/comments?post=6058"}],"version-history":[{"count":1,"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/posts\/6058\/revisions"}],"predecessor-version":[{"id":6062,"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/posts\/6058\/revisions\/6062"}],"wp:attachment":[{"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/media?parent=6058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/categories?post=6058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/news.maryland.gov\/mea\/wp-json\/wp\/v2\/tags?post=6058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}